Our firm provided design, bidding, and construction phase services for the replacement of the school’s running track. In addition to the replacement of the track, long jump, pole-vault, and high jump running surface and underlying asphalt base, additional drainage improvements were constructed along the inside of the track to maximize drainage away from the track surface, as well as new perimeter fencing, asphalt walkways, a new long jump pit and shot put ring. Our firm also designed and coordinated the purchase of custom track appurtenances and equipment.
The Township of Sparta retained our firm to provide survey and preliminary planning and design for a new sports field and recreation area facility. The proposed project consisted of design for site access, parking, lighting, synthetic and natural turf fields and stormwater management. Additionally, our firm provided the design of support facilities to accommodate the anticipated patrons, inclusive of on-site sanitary sewage treatment and disposal.