Our firm prepared the design and construction documents for the construction and modifications of the Awosting Wastewater Treatment Facility. The project included the construction of a coarse headworks screen, equalization tank, aeration system, influent pumps, fine screens, preair and anoxic zoned concrete tanks, Membrane Bioreactor System, and a sludge holding tank. The existing facilities were removed and modified to allow for chemical usage, MCC electrical systems and onsite laboratory. The upgraded plant was designed to handle a daily flow of 65,000 GPD with a peak daily flow of 180,000 GPD. We provided construction administration and observation services and were the liaison with the contractor, administration and operators on this sensitive project. The project was successfully completed on-time and on-budget.