Sussex County MUA – Vernon Pump Station #3

Sussex County MUA – Vernon Pump Station #3

​Our firm prepared the design and construction documents for the construction of the Vernon Pump Station. Included in this project was the installation of a coarse Mensch Crawler Screen, two new 925 GPM variable speed submersible pumps, a 350 kW backup generator, an emergency overflow system, wet and dry wells, new concrete building, SCADA control, bypass pumping, flow meters and hydrogen peroxide injection system. We provided construction administration and observation services and acted as the liaison with the contractor, administration and operators on this sensitive project. The project was successfully completed on-time and on-budget.