Our firm provided study, design, funding application, bidding, and construction phase services for the air conditioning of a 6000 square foot gym/multipurpose room and (18) 800 square foot classrooms. Included in this project was the installation of two 12.5 ton rooftop packaged air conditioning units for the multipurpose room and (18) 3.5 ton split ductless air conditioning systems with CO2 detection/control for fresh air intake. All units were integrated into an existing BMS system for monitoring and control. Upgrades to the electrical distribution system were required to support the new equipment.