CP ENGINEERS
  • HOME
  • ABOUT US
    • PEOPLE
    • LEADERSHIP TEAM >
      • PUSZCZ
      • DONATI
      • BREITWIESER
      • SAKOWYCH
      • CLARK
      • MIKULKA
      • KEY ENGINEERING BIOS
  • SERVICES
    • SERVICE LISTS
    • CIVIL-GOVERNMENT >
      • SITE CIVIL
      • GOVERNMENT
      • ENVIRONMENTAL
      • SOLID WASTE
      • PARKS AND RECREATION
      • GIS
      • DAMS
      • ASSET MANAGEMENT
    • WATER RESOURCES ENGINEERING >
      • WATER SUPPLY, TREATMENT & STORAGE >
        • FIRE PROTECTION
      • WATER INFRASTRUCTURE
      • WASTEWATER TREATMENT
      • WASTEWATER INFRASTRUCTURE
      • GIS
      • ASSET MANAGEMENT
      • CLIENT LIST
    • COMMERCIAL & INDUSTRIAL SERVICES >
      • MECHANICAL
      • ELECTRICAL
      • LIFE SCIENCES
      • PROCESS DESIGN
      • STRUCTURAL
      • EMERGENCY POWER
      • BUILDINGS
  • MARKETS
  • CULTURE and CAREERS
  • CONTACT US

Water Resources: Water Supply, Treatment & Storage - Example Projects


Picture

Southeast Morris County MUA - Picatinny Tank No.1 Rehabilitation

The Authority selected CP Engineers (CPE) to provide construction administration and NACE certified observation services for the contract to rehabilitate a 3 million gallon water storage tank.  During the construction, CPE discovered structural deficiencies in the tank.  CPE was engaged to design structural repairs and to provide construction administration and observation services on a separate structural repair contract.​
Picture

West Milford Township MUA - Birch Hill Park Water System Treatment Facility

CP Engineers provided planning, design, permitting, bidding, and construction phase services for the installation of a state of the art 0.02 MGD water treatment facility which serves the Birch Hill Park residential community.  Work also included water storage tank rehabilitation and upgrades. A key component of this treatment facility is to remove uranium from the system’s ground water supply.
Picture

East Orange Water Commission - WO Pump Station – Emergency Power Project

The East Orange Water Commission retained CP Engineers to design the installation of an emergency power system to provide back-up power for the entire WO pumping station. Equipment included a 2MW 5kV outdoor diesel genset in a sound attenuated enclosure with in-base fuel tank & fuel transfer system from an underground fuel tank, 5kV automatic transfer switch/pair, 1000kW 5kV loadbank, and related switchgear.  ​
Picture

Southeast Morris County MUA – Morris Plains Well House

CP Engineers is designing a new Well House for the Southeast Morris County which will house two new wells.  CPE is evaluating options for either a vertical turbine or submersible pump. The facility will include 30 days’ storage for three (3) chemicals (sodium hypochlorite, a pH adjuster, and a corrosion inhibitor). The design also includes a surveillance system and a comprehensive SCADA system which will integrate with the Authority’s existing SCADA system.   The design also includes full standby power.
Picture

Sparta Township Water Utility - Highlands Well No. 2 Upgrade

The Township of Sparta retained CP Engineers to provide permitting and design services for the rehabilitation of their Highlands Well No. 2.  Services included an engineering evaluation of the existing well and recommendations for upgrades, regulatory review and permitting, and the design of facility upgrades.
Picture

West Milford Township MUA - Highview Acres Water Storage Tank Rehabilitation

CP Engineers provided planning, design, permitting, bidding, and construction phase services for the structural repair and rehabilitation of the  MUA’s Highview Acres Water System Storage Tank.  CPE provides NACE Certified inspection services for quality assurance during the preparation and recoating of the water storage tanks.
Picture

Sussex County – Homestead Water System Upgrade

CP Engineers provided planning, design, permitting, bidding, and construction phase services for the upgrade of the existing water system at the County of Sussex – Homestead Facility.  The project provided for a new groundwater supply well and construction of a new well house to serve the County’s 100 bed Homestead Nursing Home facility.
(973) 300-9003                                                                            © CP Engineers 2020                                                  Follow: