Mark Bak designed a new, 15,000 square foot, mixed use Manufacturing/Office building. The building consists of two levels of, 3,000 square feet each, office space at the front end with the back of the building a single-story, high-bay, medical manufacturing facility with shipping and receiving dock.
Mark Bak designed a new, 26,000 square foot, mixed use Warehousing/Office Building.
CP was retained to design the foundation and pre-engineered metal building consisting of warehousing and office space. This two-story building, which is located at Commerce Park in Sparta Township, is being built on spec and will be 37,488 sq ft. Additionally, CP has also designed all of the mechanical, electrical and plumbing systems for this project.
Mark Bak designed new, 13,180 square foot, mixed use Manufacturing/Office building. The building consists of two levels of, 2,700 square feet each, office space at the front end with the back of the building a single-story, high-bay, medical manufacturing facility.
As part of the upgrade to the Oxford Wastewater Treatment Facility, CP provided Architectural Design for a 2,300 square foot pre-engineered steel building to house tertiary filters, RAS & WAS pumping, chemical feed systems, and motor control centers. In addition, CP designed a 1,000 square foot pre-engineered steel, two-bay garage building. These building provided a cost-effective alternative to convention buildings and also allowed for expediated construction to meet an NJDEP mandated compliance deadline.