When the existing wastewater treatment plant for the Washington Township Shopping Center had a catastrophic failure, the owner was forced to haul all wastewater to a remote facility at a cost of nearly $30,000 per month. We were honored that they turned to CP for help. To solve their short-term issues, CP designed and permitted a Sequencing Batch Reactor plant utilizing modified frac tanks. We were able to put this plant into full operation within a matter of months, where a permanent plant can take years. Being fully permitted through an NJDEP Treatment Works Approval, this plant will serve the needs of the facility until a planned future development necessitates further plant expansion.