Our firm provided planning, design, permitting, and construction phase services for the project which connected the Township of Sparta to the Upper Wallkill System. The project included gravity sewers, two major pumping stations, five miles of force main, and a corrosion control facility. Project challenges included a significant environmental permitting effort, hilly terrain with significant rock, and mitigation of potential corrosion issues due to the extended length of force main.