CP was engaged by the City of New Brunswick to prepare construction documents to rehabilitate three structures at Buccleuch Park: the public restroom facility, a gazebo, and a 6,600 square foot open-air pavilion. A forensic investigation of the three structures was performed consisting of a thorough examination of the buildings in order to determine the cause of many problematic issues, as well as to assess their current condition and any potential hazards. Detailed, existing conditions drawings were developed of all three structures followed by construction drawings to be used as a repair guide for bringing the structures back up to good physical condition and proper working order as well as Code and barrier free compliance.