The project included installing new chilled water chiller and boiler systems to support the 150,000 sq ft facility, medical clients manufacturing process for placental-derived cell therapy products. This project included creating as-built documentation detailing the systems’ design and specifications, along with a detailed sequence of operation for facility maintenance staff. This upgrade improved the overall environment in the GMP-compliant facility and boosted the efficiency of manufacturing operations.