Blair Academy engaged CP to design a new 905 square foot wastewater treatment facility to replace the existing facility onsite. The design of the facility included an office and lab space; ADA compliant restroom, chemical storage; and mechanical and electrical equipment rooms. The building was designed to be consistent with the architectural style of nearby campus structures at the site to ensure a cohesive appearance.