As part of the upgrade to the Oxford Wastewater Treatment Facility, CP provided Architectural Design for a 2,300 square foot pre-engineered steel building to house tertiary filters, RAS & WAS pumping, chemical feed systems, and motor control centers. In addition, CP designed a 1,000 square foot pre-engineered steel, two-bay garage building. These building provided a cost-effective alternative to convention buildings and also allowed for expediated construction to meet an NJDEP mandated compliance deadline.