The Borough of Mount Arlington retained CP to provide design, bidding, regulatory permitting and construction phase services for the rehabilitation and expansion of existing recreational trails and trailhead access parking. The design of the new trails was performed in conformance with Morris County Trail Construction Grant Program requirements and the project complied with applicable NJDEP freshwater wetlands and flood hazard area permitting requirements. Bids were received by Mount Arlington, reviewed by CP and the Borough’s legal counsel, with CP preparing the recommendation to award documents. CP provided construction administration and observation services and was the liaison with the local residents on this project.