CP was retained by Lake Mohawk Country Club to provide design and construction administration services for a boiler upgrade project for their clubhouse in Sparta, New Jersey. The upgrade included a fuel conversion from fuel oil to natural gas. The project consisted of the replacement of a noncondensing 1729 MBH hot water boiler with two high efficiency condensing boilers with combined gross output of 1000 MBH with associated equipment.