Chlorination Building & Storage Tank Design & Construction

Chlorination Building & Storage Tank Design & Construction

CP was retained by the Port Royal Municipal Authority to modernize their water system. The project included the construction of the Chlorination Building, storage tank and interconnecting facilities. This project eliminated two, 1900’s, hand-laid stone reservoirs which had significant leaks and a twenty-year-old block building which had fallen into disrepair.  The goal of the Authority is to provide the cost-effective supply of clean potable water to the residents of Port Royal Borough and Turbett Township.  By eliminating the leaks which required the Authority to withdraw approximately 120,000 gallons per day while only delivering approximately 70,000 gallons per day to their customers, the Authority saved daily operating costs.