CP ENGINEERS
  • HOME
  • ABOUT US
    • PEOPLE
    • LEADERSHIP TEAM >
      • PUSZCZ
      • DONATI
      • BREITWIESER
      • SAKOWYCH
      • CLARK
      • MIKULKA
      • KEY ENGINEERING BIOS
  • SERVICES
    • SERVICE LISTS
    • CIVIL-GOVERNMENT >
      • SITE CIVIL
      • GOVERNMENT
      • ENVIRONMENTAL
      • SOLID WASTE
      • PARKS AND RECREATION
      • GIS
      • DAMS
      • ASSET MANAGEMENT
    • WATER RESOURCES ENGINEERING >
      • WATER SUPPLY, TREATMENT & STORAGE >
        • FIRE PROTECTION
      • WATER INFRASTRUCTURE
      • WASTEWATER TREATMENT
      • WASTEWATER INFRASTRUCTURE
      • GIS
      • ASSET MANAGEMENT
      • CLIENT LIST
    • COMMERCIAL & INDUSTRIAL SERVICES >
      • MECHANICAL
      • ELECTRICAL
      • LIFE SCIENCES
      • PROCESS DESIGN
      • STRUCTURAL
      • EMERGENCY POWER
      • BUILDINGS
  • MARKETS
  • CULTURE and CAREERS
  • CONTACT US

Water Resources: Water Infrastructure - Example Projects


Picture

Hackettstown Municipal Utilities Authority-Phase IV Water System Improvements

CP Engineers provided construction management services for this project, which consisted of the replacement of approximately 4,500 linear feet of existing cast iron water main with eight (8) inch diameter ductile iron water main, the replacement of several fire hydrants and service connections, and a water main bridge crossing to replace an existing damaged main.  
Picture

Andover Utility Company- Emergency Interconnection

CP Engineers reviewed and designed an emergency interconnection between their two water systems.  Because of permitting issues the wells are not connected under normal operating procedure.  In the event of an emergency the Authority will have to open valves, flush the lines prior to utilization.  After the event the emergency line will need to be drained to keep the line clean.  During the design CPE noted that the piping in the vaults required changes to enable isolation, inspection and maintenance of the hydro pneumatic tanks, and to improve the contact time in the system.
Picture

New Jersey American Water – Infrastructure Upgrades

​CP Engineers has been overseeing construction of portions of a major infrastructure upgrade initiative by NJAW.  CPE is responsible for the day to day quality assurance inspection of the Contractor’s work to ensure it complies with NJAW standards. All work is carefully documented and detailed to ensure NJAW has accurate records that can be utilized in the future.
Picture

New Jersey American Water – Critical Crossings Condition Assessments

​CP Engineers has been retained by NJAW to inspect and provide condition assessment reports.  These crossings are considered critical based upon their locations and the consequence of failure.  These reports become an important component in the understanding and management of these assets.
Picture

American Water Military Services - Building 1 Water Main Replacement

​CP Engineers (CPE) performed a detailed analysis of the alternatives for replacement of the water service to a critical military facility building.  The analysis considered design constraints, operational concerns, and environmental constraints.  CPE prepared the formal design of the improvements and obtained all necessary approvals, including the NJDEP Wetlands, Natural Heritage, and NJ Highlands.