CP ENGINEERS
  • HOME
  • ABOUT US
    • PEOPLE
    • LEADERSHIP TEAM >
      • PUSZCZ
      • DONATI
      • BREITWIESER
      • SAKOWYCH
      • CLARK
      • MIKULKA
      • KEY ENGINEERING BIOS
  • SERVICES
    • SERVICE LISTS
    • CIVIL-GOVERNMENT >
      • SITE CIVIL
      • GOVERNMENT
      • ENVIRONMENTAL
      • SOLID WASTE
      • PARKS AND RECREATION
      • GIS
      • DAMS
      • ASSET MANAGEMENT
    • WATER RESOURCES ENGINEERING >
      • WATER SUPPLY, TREATMENT & STORAGE >
        • FIRE PROTECTION
      • WATER INFRASTRUCTURE
      • WASTEWATER TREATMENT
      • WASTEWATER INFRASTRUCTURE
      • GIS
      • ASSET MANAGEMENT
      • CLIENT LIST
    • COMMERCIAL & INDUSTRIAL SERVICES >
      • MECHANICAL
      • ELECTRICAL
      • LIFE SCIENCES
      • PROCESS DESIGN
      • STRUCTURAL
      • EMERGENCY POWER
      • BUILDINGS
  • MARKETS
  • CULTURE and CAREERS
  • CONTACT US

Civil/Municipal: Solid Waste - Example Projects


Picture

Sussex County MUA Landfill Phase 3 - Design and Construction Quality Control

​CP Engineers was responsible for planning, design, permitting, bidding, and construction phase services for the 17.5 acre Phase 3 Landfill Cell at the Sussex County Municipal Utilities Authority’s Solid Waste Landfill. By employing special design techniques and utilizing state-of-the-art materials, the firm was able to almost double the capacity of the cell, and thereby greatly extend the life of the landfill, without increasing the height of the cell above the previously approved maximum.  The project was successfully completed within budget and within a relatively strict schedule as dictated by the remaining useful life of the preceding cell.  
Picture

Pollution Control Financing Authority of Warren County - Landfill Cell 5 Quality Assurance Services

​CP Engineers was retained as the Construction Quality Assurance (CQA) Firm on the construction of the Authority’s Cell 5, in accordance with N.J.A.C. 7:26-2A.7(a)7.  CPE responsibilities included onsite inspection during construction of containment and leachate collection systems, and performance of all audits of the quality control inspections to insure proper implementation of the design and permit requirements. CPE witnessed subgrade, liner, and leachate collection system construction. CPE also attended all construction progress meetings, regularly reviewed the Construction Quality Control inspection reports, test results, and other related documentation, and communicated regularly with the NJDEP.
Picture

Sussex County MUA - Landfill Section 2 Cap Design and Construction Quality Control

​CP Engineers provided planning, design, bidding, and construction quality control services for the Section 2 Final Cap at the Sussex County Municipal Utilities Authority’s Solid Waste Landfill. This second section of the landfill closure consisted of the remaining uncapped portion of Phase 1B and a portion of Phase 2A, totaled approximately 7.4 acres.  
Picture

Sussex County MUA - Landfill Phase 2B  Design and Construction Quality Control

​CP Engineers provided planning, design, permitting, funding application, bidding, and construction quality control services for the Phase 2B Landfill at the Sussex County Municipal Utilities Authority’s Solid Waste Facility.   While prior landfill cells incorporated natural clay, which was expensive and difficult to place, the Phase 2B cell was the first at the landfill to employ a double composite, completely geosynthetic liner system consisting of GCL, geomembrane, and geosynthetic drainage net.  This resulted in a more cost effective and environmentally sound system.   
(973) 300-9003                                                                            © CP Engineers 2020                                                  Follow: